In 2010 BMH successfully modified the existing biomass and SRF handling system ready for the then upcoming gasification plant project. The new SRF handling system for the gasification plant was a turnkey project including receiving and screening of SRF, metal separation and fully automatic sampling systems, reduction of oversize fractions by means of TYRANNOSAURUS® T1202L Shredders, automatic fuel storage and dosing & feeding to gasifiers.

Kymijärvi Power Plant is now the largest SRF using plant in Finland (250,000 t/a).

lahtic308ab2ae36d6f3fba4cff0000a9597ff6a0
Customer: Lahti Energia Oy, Finland
Category: Power plant, Gasification
SRF receiving capacity: 2 x 600 m3/h, 250 000 tpa
SRF preparation capacity 2 x 600 m3/h
SRF storages volume: 2 x 7 500 m3
SRF boiler feeding capacity:  40-400 m3/h / 80 t/h
Main equipment: SRF receiving and screening with automatic sampling, TYRANNOSAURUS® BioScreen and metal separation, TYRANNOSAURUS® T1202L Shredders, storage silos with TYRANNOSAURUS® Screw Reclaimers, aluminium separation, conveyors to the gasification plant day silos.
Start-Up: 2012
Gasifier size: Total fuel power 169 MWth, District heat power 90 MW and electricity power 50 MW