Waste to Electricity solution delivered to Hankou, Wuhan, China

HJJ ( Hangzhou Jin Jiang Group) is one the biggest Waste to Energy companies using CFB boiler technology in China. As a part of HJJ´s boiler upgrade program the waste processing plant for the Hankou power plant was completely replaced by a high capacity TYRANNOSAURUS® plant.

The Hankou SRF production plant and the Xiaoshan plant are together the first of their kind in HJJ. The plant was commissioned and taken into production in 2016.

The TYRANNOSAURUS® plant can process up to 700.000 tons of local municipal solid waste (MSW) per year and consists of two processing lines with TYRANNOSAURUS® 9904 Shredders and separation lines removing magnetic metal and heavy fraction. The SRF fuel is fed into the CFB boilers for electricity production. The TYRANNOSAURUS® plant has significantly improved the boilers' performance concerning availability, yield and reduced emissions.

Customer: Hangzhou Jin Jiang Group, Hankou, Wuhan, China
Category: Waste to electricity plant
Waste processing capacity: 584.000 tpa
Receiving storage volume: 9600 m3
SRF storage volume 19800 m3
20 tph / boiler (4 boilers in total)
Boiler size / Kiln capacity:
Main equipment: TYRANNOSAURUS® 3212 Feeder, TYRANNOSAURUS® 9904 Shredder, Magnet separator, TYRANNOSAURUS® Air Classifier, Conveyors
 Start-Up 2016